What will the project involve?

  • Full reconstruction from Mittagong Creek to Albert Street
  • Width of road to 11 metres to match stage one
  • Full reconstruction of the road pavement surfaced in asphalt, similar to stage one
  • Construction of sections of kerbs and gutter where required
  • Construction of sections of concrete pedestrian paths
  • Reconstruction of some driveways as a result of road being narrowed and/or water main renewal or new kerb and gutter construction
  • Construction of additional stormwater drainage
  • Removal of a small number of very low value trees and replacement with advanced species (to be confirmed)
  • Planting of additional advanced trees in existing gaps - species to be confirmed


How much will the project cost?

  • Water main relocation and renewal = $1.2 million.
  • Road reconstruction, stormwater drainage, paths, driveways and trees = $3.3 million


Will there be further consultation?

Yes, after the design has progressed following the 21 May 2019 consultation. We expect we will be back in contact with the community in August 2019.


When will construction commence?

Water main renewal will commence around September 2019 after public tenders are called for (dependant on contractor availability and weather).Construction work will be undertaken by an independent contractor.

Work will be scheduled to avoid any conflict with Tulip Time.

Road reconstruction is planned to commence early 2020. Construction work will be undertaken by Council’s day labour crews.


Can I be notified about construction activities?

Property owners and occupiers who are directly neighbouring the works will be kept informed throughout the project via letters or notices.

An emailed newsletter may also be issued from time to time during the planning and construction periods. If you'd like to receive updates please follow the project.