TLC for Bowral Pool

No we are not putting in an ice-skating rink :-). Bowral swimming centre is just having a bit of repair work done while the pools are empty.

Here’s a summary of what we have been up to and will be doing:

  • The existing chlorinated rubber paint has been removed from the 50m, 25m and toddler pools.
  • Pool walls and floors have been skim coated to fill the concrete surface, ready for epoxy paint.
  • The edging (coping) that is around the rim of the pools will be tiled on the three pools to match both Moss Vale and Mittagong Pools.
  • Gutters have been rendered and will be painted.

It should look pretty good when completed by September 2017 and best of all there will be no more tiles falling off!

Share TLC for Bowral Pool on Facebook Share TLC for Bowral Pool on Twitter Share TLC for Bowral Pool on Linkedin Email TLC for Bowral Pool link

There are no active swimming pool consultations.

<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>